Where we build · Uxbridge, Durham Region

Custom home builder and renovation contractor in Uxbridge

Uxbridge sits on the Oak Ridges Moraine: a town core with century houses and 1970s subdivisions, and estate lots and farms across the rest of the township. Custom homes on acreage and additions on century houses are the Uxbridge jobs, with the Moraine plan and the conservation authority in the schedule on most rural lots.

Uxbridge in detail

Uxbridge, on the ground.

Whole-home renovations on older town houses and second storeys on 1970s bungalows come up as well. Wells and septic systems are the rule outside the town, and septic capacity often decides how many bedrooms an addition can carry.

The Township of Uxbridge issues the building permit. [Kam confirms typical Uxbridge permit timing and whether Savino coordinates septic design.]

Permit office

Township of Uxbridge

The Township of Uxbridge issues the permit, and septic design and the Moraine review are part of the schedule on most rural lots. [Link to the Uxbridge building permit page and typical processing time.]

Housing stock

What the lots allow

Uxbridge is century houses and 1970s subdivisions in the town core and estate lots and farms across a township that sits on the Oak Ridges Moraine.

Projects here

[n] in Uxbridge

[Kam confirms how many Savino projects have been built in Uxbridge and which ones can be shown.]

Questions from Uxbridge

Yes. The Moraine plan sets what the lot can carry and how it drains, the conservation authority reviews it, and the lot needs a septic design and a well. We map those before you commit to drawings.

The Township of Uxbridge. Additions, second storeys and new houses all need a building permit with engineered drawings.

It shapes it. The plan sets limits on site alteration and drainage, and the review comes before the permit. It rarely stops a house; it decides where the house sits.