A newly completed modern custom home at dusk, concept imagery
Concept imagery
Cantilevered second floor
Full-height glazing
Brick and cedar envelope
Custom homes · Additions · Whole-home renovations · GTA

Homes built fromthe footings up, onthe date we wrote down.

A custom home builder and renovation contractor for the Greater Toronto Area. Engineered drawings, an itemized price and a contract date before you sign, and the same person running your job who priced it.

Start a project in three steps
Stage 01 · Footings
Scroll to frame the house
How a second storey goes up

Drawn before it is built.

Every job starts as an engineered drawing like this one. Scroll and watch the house frame itself, footings to roof, the way the crew will do it on site.

Scroll
Case study · sample

A second storey on a Vaughan bungalow, told in numbers.

Every case study on the live site reads like this: what the client had, what changed, how long it took. Figures come from Savino's own files.

[n]
square feet added above the existing footprint
Framing a second storey at golden hour, concept imageryConcept imagery

The problem

A 1,100 sq ft bungalow, a growing family, a lot too narrow for a rear addition. The only way was up.

[n]
weeks from demolition to occupancy
A bungalow with a new modern second storey, concept imageryConcept imagery

What we did

New footings at four corners, a steel moment frame, a full second floor with three bedrooms and two baths, and a reworked staircase so the old house and the new floor read as one.

[date]
the handover date written into the contract
A finished spa ensuitePhoto · Desire Basements project

The result

Handed over on the contract date. The family never moved out. Photos from the owner's other company stand in until Savino has its own.

How we work

Five steps. One date that does not move.

The schedule promise. Your handover date is written into the contract. If we miss it for a reason that is ours, we pay you [$n] per day until you get your keys. [Kam confirms the terms and exclusions.]

01

Site walk and scope

We measure, photograph and ask what the house has to do. You get a written scope within [n] business days, not a verbal ballpark.

02

Drawings and permits

Engineered drawings, a photorealistic rendering of the finished space, and the permit application handled by us. Nothing starts until the city says yes.

03

The itemized quote

Every line priced, every material named in a catalogue you keep. Put it beside any other quote and you will see what they left out.

04

Build, with daily updates

Photos, schedule and change orders in one place, every day. Your project manager is the person who priced the job.

05

Handover and warranty

A walk-through with a deficiency list closed before the last payment, and a workmanship warranty of [term] in writing.

The paperwork wall

Ask any contractor for these before you sign.

Ours are on the page, dated. Each card links to the document on the live site.

Ontario WSIB

Clearance certificate

Proof that every person on your site is covered if they are hurt. Without it, the liability is yours.

Account [WSIB no.]Valid to [date]
Liability insurance

[$ limit] commercial general liability

Covers damage to your home and your neighbour's during the work.

[Insurer]Renews [date]
Licence

Municipal building licence

Required by Toronto and most GTA municipalities for anyone pulling permits on your behalf.

[Licence no.][Municipality]
New homes

HCRA licence and Tarion enrolment

Mandatory for any new home sold in Ontario. [Kam confirms the licence status.]

[HCRA no.][Status]
Warranty

[term] workmanship warranty

In writing, transferable to the next owner [confirm].

Issued at handover[term]
Memberships

[Association names]

Industry memberships with a code of conduct and a complaints process behind them.

[Association]Member since [year]

Read the paperwork in full.

Savino versus the typical contractor

Same house. Different contract.

What you getSavinoThe typical renovator
PriceItemized to the line, with a material catalogue you keepA one-page number with “allowances”
ScheduleA contract date, with [$n] per day back to you if we miss it“About three months”
DesignEngineered drawings and a photorealistic rendering before you signA sketch, if that
Daily updatesPhotos, schedule and change orders in one placeA text when you ask
Who runs your jobThe person who priced itWhoever is free
PaperworkWSIB, insurance and licences on this page, dated“We’re fully insured”
Warranty[term], in writing, transferable [confirm]One year, verbal

Every Savino row is a commitment Kam confirms before launch.

Start a project · three steps

Tell us the house. We come and see it.

No price comes from a form. Every number we give you comes from a site walk and a drawing, which is why it holds.

What are you planning?

What are we starting with?

Where is the property, and when do you want to start?

Forms go live at launch. Until then this page only logs the request.
Questions people ask first

Straight answers.

Yes, in every GTA municipality. A second storey or an addition changes the structure and the footprint, so it needs a building permit with engineered drawings, and often a zoning review first. We prepare the drawings and file the application. Budget [n] to [n] weeks for approval, depending on the city.

For most additions and structural work, yes, with dust walls and a sealed route to the site. For a second storey, the house has no roof for a period, so most families move out for [n] weeks. We tell you which one applies at the site walk, not after you sign.

We walk the house, draw it, and price every line of the drawing. A number given before that is a guess, and a guess is what turns into a change order later. The itemized quote lists every line so you can see where the money goes and take items out.

Toronto and most GTA municipalities now permit a second unit on a residential lot as-of-right, with rules on setbacks, height, lot width and fire access. We check your lot against those rules before you spend anything on drawings.