11 · Uxbridge, Durham Region

Laneway houses in Uxbridge

A laneway house is a self-contained home at the back of a lot that fronts a public lane, built where the garage stood, and the lot check comes before anything is drawn. The Uxbridge brief is usually a custom home on acreage, an addition on a century house, or a second storey on a 1970s bungalow in town.

Laneway houses · Uxbridge

Uxbridge, on the ground.

Uxbridge is century houses and 1970s subdivisions in the town core and estate lots and farms across a township that sits on the Oak Ridges Moraine. In Uxbridge that means checking the lane, the fire access route and the lot depth against the rules before the design starts. Rural lots are large, and the Moraine plan and the conservation authority review most of them before the permit. The garage comes down, the services are trenched from the house or the street, and the new house goes up at the back of the lot with deliveries from the lane.

Read more about building in Uxbridge or the full laneway houses page.

What is included

On the drawing.

01

A lot check against the laneway by-law: lane frontage, fire access route, setbacks, height, lot depth

02

Engineered drawings and a rendering of the laneway house

03

Building permit filed and followed by us, with the demolition permit for the garage

04

Foundation, framing, envelope, roof, mechanical, electrical and finishes

05

Services from the main house or the street as the drawings call for

06

A deficiency walk with the list closed before the last payment, and a written warranty

Permits in Uxbridge

Paper first.

A laneway house needs a building permit with engineered drawings and a demolition permit for the garage, and the fire access route is part of the review. The Township of Uxbridge issues the permit, and septic design and the Moraine review are part of the schedule on most rural lots.

  • A building permit with engineered drawings is required, plus a demolition permit for the garage.
  • In Toronto, laneway suites are permitted as-of-right on qualifying lots under the City's by-law; a lot outside the rules goes to the Committee of Adjustment.
  • The fire access route from the street is part of the permit review.
  • Other municipalities have their own additional residential unit rules. [Kam confirms which ones Savino has built under.]

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Uxbridge
DriverWhat we look at
Storeys and floor areaOne storey or two, and how much of the allowed footprint is used.
ServicesWater, sewer, gas and hydro run from the main house or from the street, and the distance sets the trenching.
Fire accessThe route for a fire hose from the street decides whether sprinklers or other measures are needed.
The old garageDemolition and whether the old slab and footings can go.
Finish levelKitchen, bathroom and flooring chosen from the catalogue.

No price per square foot on this site. The lot check and the drawings set the number.

Laneway houses questions from Uxbridge

It needs lane frontage, a fire access route from the street and the setbacks and lot depth the rules call for. We check the lot before drawings. [Kam confirms the Uxbridge rules Savino has built under.]

the Township of Uxbridge issues the building permit and the demolition permit for the garage, and the fire access route is part of the review.

The Township of Uxbridge. Additions, second storeys and new houses all need a building permit with engineered drawings.

It shapes it. The plan sets limits on site alteration and drainage, and the review comes before the permit. It rarely stops a house; it decides where the house sits.

A Uxbridge laneway houses starts with a site walk.

Start with a site walkSee the work