11 · Pickering, Durham Region

Laneway houses in Pickering

A laneway house is a self-contained home at the back of a lot that fronts a public lane, built where the garage stood, and the lot check comes before anything is drawn. The Pickering brief is usually a custom home on a lakefront lot, a second storey on a bungalow, or a whole-home renovation of a 1980s plan.

Laneway houses · Pickering

Pickering, on the ground.

Pickering is 1960s bungalows on deep lakefront lots in Bay Ridges and Rosebank, 1980s and 1990s subdivisions north of the 401, and new stock in Seaton. In Pickering that means checking the lane, the fire access route and the lot depth against the rules before the design starts. Lakefront lots are deep and take a crane, and the Rouge and Duffins Creek put many lots inside a conservation authority's regulated area. The garage comes down, the services are trenched from the house or the street, and the new house goes up at the back of the lot with deliveries from the lane.

Read more about building in Pickering or the full laneway houses page.

What is included

On the drawing.

01

A lot check against the laneway by-law: lane frontage, fire access route, setbacks, height, lot depth

02

Engineered drawings and a rendering of the laneway house

03

Building permit filed and followed by us, with the demolition permit for the garage

04

Foundation, framing, envelope, roof, mechanical, electrical and finishes

05

Services from the main house or the street as the drawings call for

06

A deficiency walk with the list closed before the last payment, and a written warranty

Permits in Pickering

Paper first.

A laneway house needs a building permit with engineered drawings and a demolition permit for the garage, and the fire access route is part of the review. The City of Pickering issues the permit, and lots near the creeks and the waterfront add a conservation authority review.

  • A building permit with engineered drawings is required, plus a demolition permit for the garage.
  • In Toronto, laneway suites are permitted as-of-right on qualifying lots under the City's by-law; a lot outside the rules goes to the Committee of Adjustment.
  • The fire access route from the street is part of the permit review.
  • Other municipalities have their own additional residential unit rules. [Kam confirms which ones Savino has built under.]

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Pickering
DriverWhat we look at
Storeys and floor areaOne storey or two, and how much of the allowed footprint is used.
ServicesWater, sewer, gas and hydro run from the main house or from the street, and the distance sets the trenching.
Fire accessThe route for a fire hose from the street decides whether sprinklers or other measures are needed.
The old garageDemolition and whether the old slab and footings can go.
Finish levelKitchen, bathroom and flooring chosen from the catalogue.

No price per square foot on this site. The lot check and the drawings set the number.

Laneway houses questions from Pickering

It needs lane frontage, a fire access route from the street and the setbacks and lot depth the rules call for. We check the lot before drawings. [Kam confirms the Pickering rules Savino has built under.]

the City of Pickering issues the building permit and the demolition permit for the garage, and the fire access route is part of the review.

The City of Pickering. Additions, second storeys and new houses all need a building permit with engineered drawings.

If it is inside the conservation authority's regulated area, yes. That review comes before the permit and sets what can be built and where.

A Pickering laneway houses starts with a site walk.

Start with a site walkSee the work