03 · Pickering, Durham Region

Home additions in Pickering

An addition is more house on the same lot, and the job lives or dies at the tie-in: where the new foundation meets the old, where the roofs meet, and where the floors have to line up. The Pickering brief is usually a custom home on a lakefront lot, a second storey on a bungalow, or a whole-home renovation of a 1980s plan.

Home additions · Pickering

Pickering, on the ground.

Pickering is 1960s bungalows on deep lakefront lots in Bay Ridges and Rosebank, 1980s and 1990s subdivisions north of the 401, and new stock in Seaton. On that stock in Pickering, the rear addition with a new kitchen across the back is the most common brief, with two-storey additions where the lot has the depth. Lakefront lots are deep and take a crane, and the Rouge and Duffins Creek put many lots inside a conservation authority's regulated area. The addition goes up as a shell before the wall into the house is opened, so most families stay through the work, and the machine access to the back yard is planned at the site walk.

Read more about building in Pickering or the full home additions page.

What is included

On the drawing.

01

Zoning check of setbacks and lot coverage before design so the addition fits the lot

02

Engineered drawings and a rendering of the addition inside and out

03

Building permit filed and followed by us, with any conservation review handled first

04

Excavation, new foundation, framing, roof and envelope tied into the existing structure

05

Openings cut into the old house under shoring, with beams sized by the engineer

06

Mechanical and electrical extended, finishes from the catalogue, a deficiency walk and a written warranty

Permits in Pickering

Paper first.

An addition needs a building permit with engineered drawings, and the setbacks and lot coverage in the zoning by-law decide whether the design goes straight to permit or to the Committee of Adjustment first. The City of Pickering issues the permit, and lots near the creeks and the waterfront add a conservation authority review.

  • A building permit with engineered drawings is required in every GTA municipality.
  • Setbacks and lot coverage come from the zoning by-law; a design outside them goes to the Committee of Adjustment first.
  • Lots inside a conservation authority's regulated area need its review before the permit.
  • Heritage listing adds a review of anything visible from the street.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Pickering
DriverWhat we look at
Floor area and storeysA single-storey rear addition and a two-storey one share a foundation but not much else.
The tie-inHow much of the existing rear wall opens up, and whether the roofs meet cleanly or the old roof is reworked.
Foundation typeFull basement under the addition, crawl space or slab, and what the soil and the water table allow.
Lot constraintsSetbacks, lot coverage, a ravine or conservation edge, and how a machine reaches the back yard.
Finish levelKitchen and bathroom scope inside the addition, chosen from the catalogue.

No price per square foot on this site. The zoning check and the drawings set the number, and the number holds because of them.

Home additions questions from Pickering

The zoning by-law sets rear and side setbacks and a lot coverage limit. We run the check before design so the addition you draw is one the City of Pickering will approve.

Usually. The shell goes up first, the wall between the house and the addition opens last, and dust walls seal the route in between.

Usually. The 1960s bungalows there sit on deep lots with room for a crane, and the engineer confirms the foundation from a test pit before drawings.

The City of Pickering. Additions, second storeys and new houses all need a building permit with engineered drawings.

A Pickering home additions starts with a site walk.

Start with a site walkSee the work