Kitchen renovations in Pickering

A kitchen renovation in the GTA is usually a structural job in disguise: the wall that has to come out carries the floor above, and the sink is moving to where the drain is not. Pickering is 1960s bungalows on deep lakefront lots in Bay Ridges and Rosebank, 1980s and 1990s subdivisions north of the 401, and new stock in Seaton. In those houses in Pickering, the kitchen is usually at the back, walled off from the dining room, and the job is to open it up and bring it into the plan.

Kitchen renovations · Pickering

Pickering, on the ground.

Lakefront lots are deep and take a crane, and the Rouge and Duffins Creek put many lots inside a conservation authority's regulated area. The kitchen comes out behind dust walls, the beam and the services go in, and the cabinets, stone and appliances from the catalogue go in last, with the rest of the house kept clean throughout.

Read more about building in Pickering or the full kitchen renovations page.

What is included

On the drawing.

01

A measured plan and a rendering of the finished kitchen before you sign

02

Engineered drawings for any wall that comes out, and the building permit if one is needed

03

Demolition with dust walls and floor protection to the rest of the house

04

Beam and posts where a wall comes out, plumbing and electrical moved to the new plan

05

Cabinets, counters, backsplash, lighting, flooring and appliances installed from the catalogue

06

A deficiency walk with the list closed before the last payment, and a written warranty

Permits in Pickering

Paper first.

A kitchen renovation needs a building permit where a load-bearing wall comes out or plumbing is relocated, and the electrical is inspected under its own permit. The City of Pickering issues the permit, and lots near the creeks and the waterfront add a conservation authority review.

  • A building permit is required where a load-bearing wall comes out or plumbing is relocated.
  • Electrical work is inspected under the Electrical Safety Authority's permit, pulled by the licensed electrician.
  • A kitchen rebuilt in the same footprint with the same services usually needs no building permit.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Pickering
DriverWhat we look at
Does the plan changeA kitchen in the same footprint with new finishes, or a kitchen that moves and opens into the next room.
StructureA load-bearing wall coming out is a beam, posts and footings sized by the engineer.
ServicesHow far the sink, the range and the panel circuits move from where they are.
Cabinets and stoneCustom versus semi-custom cabinets, counter material, and the length of the run.
AppliancesPanel-ready, gas versus induction, a hood that needs a new duct through the roof.

No price ranges on this site. The measured plan sets the number, and the catalogue lets you move it line by line.

Kitchen renovations questions from Pickering

If a wall comes out or the plumbing moves, yes, from the City of Pickering. A kitchen rebuilt in place with the same services usually does not. We tell you which at the site walk.

Weeks for a kitchen rebuilt in place, longer when a wall comes out and the plan changes. The schedule is written into the contract with the drawings.

Usually. The 1960s bungalows there sit on deep lots with room for a crane, and the engineer confirms the foundation from a test pit before drawings.

The City of Pickering. Additions, second storeys and new houses all need a building permit with engineered drawings.

A Pickering kitchen renovations starts with a site walk.

Start with a site walkSee the work