06 · Oshawa, Durham Region

Kitchen renovations in Oshawa

Older lots are narrower than the subdivisions, so the site plan decides where the bin and the crane go, and lots near Oshawa Creek add a conservation review. The kitchen comes out behind dust walls, the beam and the services go in, and the cabinets, stone and appliances from the catalogue go in last, with the rest of the house kept clean throughout. A kitchen renovation in the GTA is usually a structural job in disguise: the wall that has to come out carries the floor above, and the sink is moving to where the drain is not.

Kitchen renovations · Oshawa

Oshawa, on the ground.

Oshawa is century houses around the downtown, 1920s and 1930s streets north of it, wartime and 1950s houses through the middle, and newer subdivisions north of Taunton. In those houses in Oshawa, the kitchen is usually at the back, walled off from the dining room, and the job is to open it up and bring it into the plan. The Oshawa brief is usually a whole-home renovation of a century house, a second storey on a 1950s bungalow, or a lowered basement for a legal suite.

Read more about building in Oshawa or the full kitchen renovations page.

What is included

On the drawing.

01

A measured plan and a rendering of the finished kitchen before you sign

02

Engineered drawings for any wall that comes out, and the building permit if one is needed

03

Demolition with dust walls and floor protection to the rest of the house

04

Beam and posts where a wall comes out, plumbing and electrical moved to the new plan

05

Cabinets, counters, backsplash, lighting, flooring and appliances installed from the catalogue

06

A deficiency walk with the list closed before the last payment, and a written warranty

Permits in Oshawa

Paper first.

A kitchen renovation needs a building permit where a load-bearing wall comes out or plumbing is relocated, and the electrical is inspected under its own permit. The City of Oshawa issues the permit, and heritage designation downtown adds a review to exterior work.

  • A building permit is required where a load-bearing wall comes out or plumbing is relocated.
  • Electrical work is inspected under the Electrical Safety Authority's permit, pulled by the licensed electrician.
  • A kitchen rebuilt in the same footprint with the same services usually needs no building permit.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Oshawa
DriverWhat we look at
Does the plan changeA kitchen in the same footprint with new finishes, or a kitchen that moves and opens into the next room.
StructureA load-bearing wall coming out is a beam, posts and footings sized by the engineer.
ServicesHow far the sink, the range and the panel circuits move from where they are.
Cabinets and stoneCustom versus semi-custom cabinets, counter material, and the length of the run.
AppliancesPanel-ready, gas versus induction, a hood that needs a new duct through the roof.

No price ranges on this site. The measured plan sets the number, and the catalogue lets you move it line by line.

Kitchen renovations questions from Oshawa

If a wall comes out or the plumbing moves, yes, from the City of Oshawa. A kitchen rebuilt in place with the same services usually does not. We tell you which at the site walk.

Weeks for a kitchen rebuilt in place, longer when a wall comes out and the plan changes. The schedule is written into the contract with the drawings.

The City of Oshawa. Additions, second storeys, new houses and second units all need a building permit with engineered drawings.

Usually, once ceiling height and egress meet code. Older basements often need underpinning to get there. We measure at the site walk.

A Oshawa kitchen renovations starts with a site walk.

Start with a site walkSee the work