Load-bearing wall removal in Oshawa
Older lots are narrower than the subdivisions, so the site plan decides where the bin and the crane go, and lots near Oshawa Creek add a conservation review. The floor above is shored on both sides, the wall comes out behind dust walls, the beam is set and landed on new footings, and the finishes are patched so the wall was never there. Taking out a load-bearing wall is an engineering job with a demolition inside it: the engineer sizes the beam, the posts and the footings, and the crew shores the floor, cuts the wall and lands the steel.
Oshawa, on the ground.
Oshawa is century houses around the downtown, 1920s and 1930s streets north of it, wartime and 1950s houses through the middle, and newer subdivisions north of Taunton. In those houses in Oshawa, the wall between the kitchen and the dining room is the one that usually comes out, and it usually carries the floor above. The Oshawa brief is usually a whole-home renovation of a century house, a second storey on a 1950s bungalow, or a lowered basement for a legal suite.
Read more about building in Oshawa or the full load-bearing wall removal page.
On the drawing.
A site walk that identifies which walls carry load and what sits above them
Engineered drawings with the beam, posts and footings sized
Building permit filed and followed by us
Temporary shoring on both sides of the wall, floor protection and dust walls
Wall out, beam set, posts landed on new footings, floors levelled
Drywall, flooring and finishes patched or replaced so the wall was never there
Paper first.
A load-bearing wall needs a building permit with an engineer's drawing, and the inspector sees the beam and posts before they are closed in. The City of Oshawa issues the permit, and heritage designation downtown adds a review to exterior work.
- A building permit with engineered drawings is required in every GTA municipality for any wall that carries load.
- The inspector sees the beam and the posts before they are closed in.
- Ducts, plumbing and wiring moved out of the wall are permitted and inspected with their own trades.
The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.
| Driver | What we look at |
|---|---|
| Span and load | A long opening under two floors needs a bigger beam and posts on new footings. |
| Flush or dropped beam | A beam hidden in the ceiling costs more than one below it, and the joists above decide whether it is possible. |
| Footings | Posts need something to land on, and that can mean new footings through the basement slab. |
| What is in the wall | Ducts, plumbing and wiring that have to move before the wall can go. |
| Finishes | Matching an old hardwood floor across the opening, or refinishing the whole room. |
No price per wall on this site. The engineer's drawing sets the number.
For a load-bearing wall, yes, from the City of Oshawa, with an engineer's drawing. For a partition wall carrying nothing, usually no. We tell you which at the site walk.
Often. A flush beam sits between the joists so the ceiling stays flat. It costs more than a dropped beam, and what is above decides whether it is possible.
Usually, and often it should be. The foundation and the framing decide it. We open up enough at the site walk to tell you which before you pay for drawings.
The City of Oshawa. Additions, second storeys, new houses and second units all need a building permit with engineered drawings.