Load-bearing wall removal in Clarington

Village lots are deep and rural lots are large, and the moraine and the creeks put some lots inside a conservation authority's regulated area. The floor above is shored on both sides, the wall comes out behind dust walls, the beam is set and landed on new footings, and the finishes are patched so the wall was never there. Taking out a load-bearing wall is an engineering job with a demolition inside it: the engineer sizes the beam, the posts and the footings, and the crew shores the floor, cuts the wall and lands the steel.

Load-bearing wall removal · Clarington

Clarington, on the ground.

Clarington is century houses in Bowmanville, Newcastle and Orono, new subdivisions in Courtice and west Bowmanville, and rural lots on wells and septic systems. In those houses in Clarington, the wall between the kitchen and the dining room is the one that usually comes out, and it usually carries the floor above. The Clarington brief is usually a custom home on a rural lot, an addition on a village house, or a whole-home renovation of century stock.

Read more about building in Clarington or the full load-bearing wall removal page.

What is included

On the drawing.

01

A site walk that identifies which walls carry load and what sits above them

02

Engineered drawings with the beam, posts and footings sized

03

Building permit filed and followed by us

04

Temporary shoring on both sides of the wall, floor protection and dust walls

05

Wall out, beam set, posts landed on new footings, floors levelled

06

Drywall, flooring and finishes patched or replaced so the wall was never there

Permits in Clarington

Paper first.

A load-bearing wall needs a building permit with an engineer's drawing, and the inspector sees the beam and posts before they are closed in. The Municipality of Clarington issues the permit, and unserviced lots add well and septic design to the schedule.

  • A building permit with engineered drawings is required in every GTA municipality for any wall that carries load.
  • The inspector sees the beam and the posts before they are closed in.
  • Ducts, plumbing and wiring moved out of the wall are permitted and inspected with their own trades.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Clarington
DriverWhat we look at
Span and loadA long opening under two floors needs a bigger beam and posts on new footings.
Flush or dropped beamA beam hidden in the ceiling costs more than one below it, and the joists above decide whether it is possible.
FootingsPosts need something to land on, and that can mean new footings through the basement slab.
What is in the wallDucts, plumbing and wiring that have to move before the wall can go.
FinishesMatching an old hardwood floor across the opening, or refinishing the whole room.

No price per wall on this site. The engineer's drawing sets the number.

Load-bearing wall removal questions from Clarington

For a load-bearing wall, yes, from the Municipality of Clarington, with an engineer's drawing. For a partition wall carrying nothing, usually no. We tell you which at the site walk.

Often. A flush beam sits between the joists so the ceiling stays flat. It costs more than a dropped beam, and what is above decides whether it is possible.

The Municipality of Clarington, for Bowmanville, Courtice, Newcastle and Orono alike. Additions, second storeys and new houses all need a building permit with engineered drawings.

Usually. The lots are deep, and the tie-in between the new addition and the old house is the engineering question the site walk answers. Heritage designation adds a review if it applies.

A Clarington load-bearing wall removal starts with a site walk.