Whole-home renovations in King
A whole-home renovation rebuilds a house around the family living in it now: walls out under steel, the kitchen where it should be, bathrooms added, mechanical and electrical replaced, and finishes from a catalogue you keep. The King brief is usually a custom home on an estate lot, an addition on a farmhouse, or a whole-home renovation in one of the villages.
King, on the ground.
King is estate lots and farmhouses between King City, Nobleton and Schomberg, most on the Oak Ridges Moraine with wells and septic systems. That is the stock where a whole-home renovation in King makes sense: a house worth keeping with a plan that no longer works. Lots are large and access is easy, but the Moraine plan and the conservation authority review most rural sites before the permit. The house is stripped to the studs where the plan changes, the structure and the services are rebuilt, and the finishes go in last, with the schedule written into the contract and daily photos while it runs.
Read more about building in King or the full whole-home renovations page.
On the drawing.
A measured survey of the house and a redesigned plan with a rendering of the finished space
Engineered drawings for every wall that comes out and every beam that replaces it
Building permit filed and followed by us
Strip-out to the studs where the plan changes, with dust walls where you are staying
Structure, mechanical, electrical, plumbing, insulation, drywall and finishes by our crew and our trades
A deficiency walk with the list closed before the last payment, and a written warranty
Paper first.
A whole-home renovation needs a building permit wherever structure, plumbing or the envelope changes, with engineered drawings for every wall that comes out. The Township of King issues the permit, and septic design and the Moraine review are part of the schedule on most rural lots.
- A building permit is required where structure, plumbing or the building envelope changes, which a whole-home renovation nearly always does.
- Every load-bearing wall that comes out needs engineered drawings as part of the permit.
- Electrical work is inspected under the Electrical Safety Authority's permit, pulled by the licensed electrician.
- Heritage listing adds a review of anything visible from the street.
The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.
| Driver | What we look at |
|---|---|
| How much of the plan changes | Moving a kitchen and adding a bathroom moves plumbing and structure; refinishing the same plan does not. |
| Structure | Every load-bearing wall that comes out is a beam, posts and footings sized by the engineer. |
| Mechanical and electrical | Whether the furnace, the panel and the plumbing stack are replaced or extended. |
| Finish level | Kitchen, bathrooms, flooring, millwork and stone chosen from the catalogue. |
| If you stay | Working around a family in the house is slower than working in an empty one, and the schedule reflects it. |
No price per square foot on this site. The measured survey and the drawings set the number, and the number holds because of them.
Sometimes, if the work can be staged floor by floor with a kitchen and a bathroom kept in service. Often moving out is faster and costs less. We tell you which at the site walk.
Yes, wherever structure, plumbing or the envelope changes, which it nearly always does. the Township of King issues it, and we prepare the drawings and file it.
Often. The number of bedrooms an addition adds has to match what the septic system can serve, and that can mean a new system. It comes up at the site walk.
Yes. The Moraine plan sets what the lot can carry and how it drains, the conservation authority reviews it, and a rural lot needs a septic design and a well. We map those before you commit to drawings.