02 · King, York Region

Second storey additions in King

Lots are large and access is easy, but the Moraine plan and the conservation authority review most rural sites before the permit. The roof comes off in one planned stretch, the house is weather-protected while the floor is framed and closed in, and the family is usually out for that period, which the schedule is written around. A second storey is the addition that keeps the lot. The roof comes off, a new floor goes on, and the old house and the new one have to read as a single building, which starts with a test pit and an engineer's answer on what the footings can carry.

Second storey additions · King

King, on the ground.

King is estate lots and farmhouses between King City, Nobleton and Schomberg, most on the Oak Ridges Moraine with wells and septic systems. Those houses are the usual second storey candidates in King, and the lot width decides how simple the crane day is. The King brief is usually a custom home on an estate lot, an addition on a farmhouse, or a whole-home renovation in one of the villages.

Read more about building in King or the full second storey additions page.

What is included

On the drawing.

01

A test pit at the site walk stage so the engineer sees the footings before a floor is drawn

02

Engineered drawings with the load path decided: reinforced footings, new corner footings or a steel frame

03

Building permit filed and followed by us, with the zoning height check done first

04

Roof removal, temporary weather protection, floor and wall framing, new roof and envelope

05

Staircase, mechanical and electrical extended to the new floor, finishes from the catalogue

06

A deficiency walk with the list closed before the last payment, and a written warranty

Permits in King

Paper first.

A second storey needs a building permit with engineered drawings, and the zoning height limit for the street decides whether the design goes straight to permit or through the Committee of Adjustment first. The Township of King issues the permit, and septic design and the Moraine review are part of the schedule on most rural lots.

  • A building permit with engineered drawings is required in every GTA municipality.
  • The zoning by-law sets a height limit for the street; a design above it goes to the Committee of Adjustment first.
  • On a semi, the drawings show how the new load stays off the shared wall.
  • Heritage listing adds a review of anything visible from the street.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in King
DriverWhat we look at
What the foundation can carryReinforced footings cost less than a steel moment frame, and only the test pit tells us which one you need.
Floor area of the new storeyA full floor over the whole footprint, or a partial one set back from the front.
Roof and envelopeRoof form, cladding that matches or replaces the ground floor, window count.
The ground floorWhether the stair opening and the mechanical runs mean the ground floor is reworked at the same time.
Where you live during the buildA second storey usually means moving out for a period, and the schedule is built around that.

No price per square foot on this site. The test pit and the drawings set the number, and the number holds because of them.

Second storey additions questions from King

Most can, with reinforced footings or a steel frame decided by the engineer from a test pit. We open one at the site walk stage so the answer is in the price before drawings.

It depends on whether the design fits the height limit for the street. Inside the envelope it goes through as a building permit from the Township of King; above it, the Committee of Adjustment comes first. [Kam confirms typical timing.]

Often. The number of bedrooms an addition adds has to match what the septic system can serve, and that can mean a new system. It comes up at the site walk.

Yes. The Moraine plan sets what the lot can carry and how it drains, the conservation authority reviews it, and a rural lot needs a septic design and a well. We map those before you commit to drawings.

A King second storey additions starts with a site walk.