Whole-home renovations in Markham

A whole-home renovation rebuilds a house around the family living in it now: walls out under steel, the kitchen where it should be, bathrooms added, mechanical and electrical replaced, and finishes from a catalogue you keep. Markham is heritage districts in Unionville and Markham Village, 1970s and 1980s subdivisions in Thornhill and Milliken, and newer stock in Cornell and Berczy. That is the stock where a whole-home renovation in Markham makes sense: a house worth keeping with a plan that no longer works.

Whole-home renovations · Markham

Markham, on the ground.

Subdivision lots take a crane and a bin, and lots along the Rouge add a conservation authority review. The house is stripped to the studs where the plan changes, the structure and the services are rebuilt, and the finishes go in last, with the schedule written into the contract and daily photos while it runs.

Read more about building in Markham or the full whole-home renovations page.

What is included

On the drawing.

01

A measured survey of the house and a redesigned plan with a rendering of the finished space

02

Engineered drawings for every wall that comes out and every beam that replaces it

03

Building permit filed and followed by us

04

Strip-out to the studs where the plan changes, with dust walls where you are staying

05

Structure, mechanical, electrical, plumbing, insulation, drywall and finishes by our crew and our trades

06

A deficiency walk with the list closed before the last payment, and a written warranty

Permits in Markham

Paper first.

A whole-home renovation needs a building permit wherever structure, plumbing or the envelope changes, with engineered drawings for every wall that comes out. The City of Markham issues the permit, and heritage designation adds a review to anything visible from the street.

  • A building permit is required where structure, plumbing or the building envelope changes, which a whole-home renovation nearly always does.
  • Every load-bearing wall that comes out needs engineered drawings as part of the permit.
  • Electrical work is inspected under the Electrical Safety Authority's permit, pulled by the licensed electrician.
  • Heritage listing adds a review of anything visible from the street.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Markham
DriverWhat we look at
How much of the plan changesMoving a kitchen and adding a bathroom moves plumbing and structure; refinishing the same plan does not.
StructureEvery load-bearing wall that comes out is a beam, posts and footings sized by the engineer.
Mechanical and electricalWhether the furnace, the panel and the plumbing stack are replaced or extended.
Finish levelKitchen, bathrooms, flooring, millwork and stone chosen from the catalogue.
If you stayWorking around a family in the house is slower than working in an empty one, and the schedule reflects it.

No price per square foot on this site. The measured survey and the drawings set the number, and the number holds because of them.

Whole-home renovations questions from Markham

Sometimes, if the work can be staged floor by floor with a kitchen and a bathroom kept in service. Often moving out is faster and costs less. We tell you which at the site walk.

Yes, wherever structure, plumbing or the envelope changes, which it nearly always does. the City of Markham issues it, and we prepare the drawings and file it.

The City of Markham. Additions, second storeys, new houses and second units all need a building permit with engineered drawings.

Most can. The engineer confirms the foundation from a test pit, and the lots in Thornhill and Milliken have the room for a crane.

A Markham whole-home renovations starts with a site walk.