09 · Richmond Hill, York Region

Load-bearing wall removal in Richmond Hill

Taking out a load-bearing wall is an engineering job with a demolition inside it: the engineer sizes the beam, the posts and the footings, and the crew shores the floor, cuts the wall and lands the steel. The Richmond Hill brief is usually a second storey on a bungalow off Yonge, a rear addition on a 1980s house, or a custom home where a bungalow has run its course.

Load-bearing wall removal · Richmond Hill

Richmond Hill, on the ground.

Richmond Hill is older streets around the Mill Pond and off Yonge, 1970s and 1980s subdivisions, and moraine lots at the north end, mostly on 50 and 60 foot lots. In those houses in Richmond Hill, the wall between the kitchen and the dining room is the one that usually comes out, and it usually carries the floor above. Lots have the width for a crane and a bin, and the mature trees on older streets are protected, so the site plan works around them. The floor above is shored on both sides, the wall comes out behind dust walls, the beam is set and landed on new footings, and the finishes are patched so the wall was never there.

Read more about building in Richmond Hill or the full load-bearing wall removal page.

What is included

On the drawing.

01

A site walk that identifies which walls carry load and what sits above them

02

Engineered drawings with the beam, posts and footings sized

03

Building permit filed and followed by us

04

Temporary shoring on both sides of the wall, floor protection and dust walls

05

Wall out, beam set, posts landed on new footings, floors levelled

06

Drywall, flooring and finishes patched or replaced so the wall was never there

Permits in Richmond Hill

Paper first.

A load-bearing wall needs a building permit with an engineer's drawing, and the inspector sees the beam and posts before they are closed in. The City of Richmond Hill issues the permit, and moraine lots at the north end add the conservation authority and the Moraine plan to the review.

  • A building permit with engineered drawings is required in every GTA municipality for any wall that carries load.
  • The inspector sees the beam and the posts before they are closed in.
  • Ducts, plumbing and wiring moved out of the wall are permitted and inspected with their own trades.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Richmond Hill
DriverWhat we look at
Span and loadA long opening under two floors needs a bigger beam and posts on new footings.
Flush or dropped beamA beam hidden in the ceiling costs more than one below it, and the joists above decide whether it is possible.
FootingsPosts need something to land on, and that can mean new footings through the basement slab.
What is in the wallDucts, plumbing and wiring that have to move before the wall can go.
FinishesMatching an old hardwood floor across the opening, or refinishing the whole room.

No price per wall on this site. The engineer's drawing sets the number.

Load-bearing wall removal questions from Richmond Hill

For a load-bearing wall, yes, from the City of Richmond Hill, with an engineer's drawing. For a partition wall carrying nothing, usually no. We tell you which at the site walk.

Often. A flush beam sits between the joists so the ceiling stays flat. It costs more than a dropped beam, and what is above decides whether it is possible.

Usually, with reinforcement the engineer decides from a test pit. The lots off Yonge and around the Mill Pond have the width for a crane, and a second storey keeps the footprint and the mature trees.

The City of Richmond Hill. Additions, second storeys and new houses all need a building permit with engineered drawings.

A Richmond Hill load-bearing wall removal starts with a site walk.

Start with a site walkSee the work