09 · Markham, York Region

Load-bearing wall removal in Markham

Subdivision lots take a crane and a bin, and lots along the Rouge add a conservation authority review. The floor above is shored on both sides, the wall comes out behind dust walls, the beam is set and landed on new footings, and the finishes are patched so the wall was never there. Taking out a load-bearing wall is an engineering job with a demolition inside it: the engineer sizes the beam, the posts and the footings, and the crew shores the floor, cuts the wall and lands the steel.

Load-bearing wall removal · Markham

Markham, on the ground.

Markham is heritage districts in Unionville and Markham Village, 1970s and 1980s subdivisions in Thornhill and Milliken, and newer stock in Cornell and Berczy. In those houses in Markham, the wall between the kitchen and the dining room is the one that usually comes out, and it usually carries the floor above. The Markham brief is usually a second storey on a 1980s house, a rear addition behind a heritage house, or a custom home on a deep Thornhill lot.

Read more about building in Markham or the full load-bearing wall removal page.

What is included

On the drawing.

01

A site walk that identifies which walls carry load and what sits above them

02

Engineered drawings with the beam, posts and footings sized

03

Building permit filed and followed by us

04

Temporary shoring on both sides of the wall, floor protection and dust walls

05

Wall out, beam set, posts landed on new footings, floors levelled

06

Drywall, flooring and finishes patched or replaced so the wall was never there

Permits in Markham

Paper first.

A load-bearing wall needs a building permit with an engineer's drawing, and the inspector sees the beam and posts before they are closed in. The City of Markham issues the permit, and heritage designation adds a review to anything visible from the street.

  • A building permit with engineered drawings is required in every GTA municipality for any wall that carries load.
  • The inspector sees the beam and the posts before they are closed in.
  • Ducts, plumbing and wiring moved out of the wall are permitted and inspected with their own trades.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Markham
DriverWhat we look at
Span and loadA long opening under two floors needs a bigger beam and posts on new footings.
Flush or dropped beamA beam hidden in the ceiling costs more than one below it, and the joists above decide whether it is possible.
FootingsPosts need something to land on, and that can mean new footings through the basement slab.
What is in the wallDucts, plumbing and wiring that have to move before the wall can go.
FinishesMatching an old hardwood floor across the opening, or refinishing the whole room.

No price per wall on this site. The engineer's drawing sets the number.

Load-bearing wall removal questions from Markham

For a load-bearing wall, yes, from the City of Markham, with an engineer's drawing. For a partition wall carrying nothing, usually no. We tell you which at the site walk.

Often. A flush beam sits between the joists so the ceiling stays flat. It costs more than a dropped beam, and what is above decides whether it is possible.

Most can. The engineer confirms the foundation from a test pit, and the lots in Thornhill and Milliken have the room for a crane.

Yes, with a heritage review of anything visible from the street. Additions usually go to the rear and follow the character of the house. We bring that into the design before the permit application, not after.

A Markham load-bearing wall removal starts with a site walk.

Start with a site walkSee the work