Load-bearing wall removal in Aurora

Taking out a load-bearing wall is an engineering job with a demolition inside it: the engineer sizes the beam, the posts and the footings, and the crew shores the floor, cuts the wall and lands the steel. Aurora is century houses and 1950s bungalows on generous lots in the old core along Yonge, ringed by subdivisions from the 1980s onward. In those houses in Aurora, the wall between the kitchen and the dining room is the one that usually comes out, and it usually carries the floor above.

Load-bearing wall removal · Aurora

Aurora, on the ground.

Older lots have the width for a crane and a bin, and lots on the moraine add a conservation authority review. The floor above is shored on both sides, the wall comes out behind dust walls, the beam is set and landed on new footings, and the finishes are patched so the wall was never there.

Read more about building in Aurora or the full load-bearing wall removal page.

What is included

On the drawing.

01

A site walk that identifies which walls carry load and what sits above them

02

Engineered drawings with the beam, posts and footings sized

03

Building permit filed and followed by us

04

Temporary shoring on both sides of the wall, floor protection and dust walls

05

Wall out, beam set, posts landed on new footings, floors levelled

06

Drywall, flooring and finishes patched or replaced so the wall was never there

Permits in Aurora

Paper first.

A load-bearing wall needs a building permit with an engineer's drawing, and the inspector sees the beam and posts before they are closed in. The Town of Aurora issues the permit, and heritage listings in the core add a review to exterior work.

  • A building permit with engineered drawings is required in every GTA municipality for any wall that carries load.
  • The inspector sees the beam and the posts before they are closed in.
  • Ducts, plumbing and wiring moved out of the wall are permitted and inspected with their own trades.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Aurora
DriverWhat we look at
Span and loadA long opening under two floors needs a bigger beam and posts on new footings.
Flush or dropped beamA beam hidden in the ceiling costs more than one below it, and the joists above decide whether it is possible.
FootingsPosts need something to land on, and that can mean new footings through the basement slab.
What is in the wallDucts, plumbing and wiring that have to move before the wall can go.
FinishesMatching an old hardwood floor across the opening, or refinishing the whole room.

No price per wall on this site. The engineer's drawing sets the number.

Load-bearing wall removal questions from Aurora

For a load-bearing wall, yes, from the Town of Aurora, with an engineer's drawing. For a partition wall carrying nothing, usually no. We tell you which at the site walk.

Often. A flush beam sits between the joists so the ceiling stays flat. It costs more than a dropped beam, and what is above decides whether it is possible.

The Town of Aurora. Additions, second storeys and new houses all need a building permit with engineered drawings, and heritage listings in the core add a review.

On lots inside the Moraine plan area, yes. The plan and the conservation authority review what can be built and how the site drains, and that review comes before the permit.

A Aurora load-bearing wall removal starts with a site walk.