06 · Scarborough, City of Toronto

Kitchen renovations in Scarborough

Driveways and side yards are wide enough for a crane and a material drop, so less is carried by hand than in the old city. The kitchen comes out behind dust walls, the beam and the services go in, and the cabinets, stone and appliances from the catalogue go in last, with the rest of the house kept clean throughout. A kitchen renovation in the GTA is usually a structural job in disguise: the wall that has to come out carries the floor above, and the sink is moving to where the drain is not.

Kitchen renovations · Scarborough

Scarborough, on the ground.

Scarborough is mostly 1950s to 1970s bungalows and side-splits on 40 to 50 foot lots, the easiest houses in the city to add a floor to. In those houses in Scarborough, the kitchen is usually at the back, walled off from the dining room, and the job is to open it up and bring it into the plan. The Scarborough brief is usually a second storey on a bungalow, a rear addition with an open kitchen, or a lowered basement for a legal suite.

Read more about building in Scarborough or the full kitchen renovations page.

What is included

On the drawing.

01

A measured plan and a rendering of the finished kitchen before you sign

02

Engineered drawings for any wall that comes out, and the building permit if one is needed

03

Demolition with dust walls and floor protection to the rest of the house

04

Beam and posts where a wall comes out, plumbing and electrical moved to the new plan

05

Cabinets, counters, backsplash, lighting, flooring and appliances installed from the catalogue

06

A deficiency walk with the list closed before the last payment, and a written warranty

Permits in Scarborough

Paper first.

A kitchen renovation needs a building permit where a load-bearing wall comes out or plumbing is relocated, and the electrical is inspected under its own permit. Permits come from Toronto Building; Scarborough has had no separate office since amalgamation in 1998, and lots near the Bluffs add a conservation review.

  • A building permit is required where a load-bearing wall comes out or plumbing is relocated.
  • Electrical work is inspected under the Electrical Safety Authority's permit, pulled by the licensed electrician.
  • A kitchen rebuilt in the same footprint with the same services usually needs no building permit.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Scarborough
DriverWhat we look at
Does the plan changeA kitchen in the same footprint with new finishes, or a kitchen that moves and opens into the next room.
StructureA load-bearing wall coming out is a beam, posts and footings sized by the engineer.
ServicesHow far the sink, the range and the panel circuits move from where they are.
Cabinets and stoneCustom versus semi-custom cabinets, counter material, and the length of the run.
AppliancesPanel-ready, gas versus induction, a hood that needs a new duct through the roof.

No price ranges on this site. The measured plan sets the number, and the catalogue lets you move it line by line.

Kitchen renovations questions from Scarborough

If a wall comes out or the plumbing moves, yes, from the City of Toronto (Toronto Building). A kitchen rebuilt in place with the same services usually does not. We tell you which at the site walk.

Weeks for a kitchen rebuilt in place, longer when a wall comes out and the plan changes. The schedule is written into the contract with the drawings.

The City of Toronto. Scarborough has been inside the City since 1998, so the application goes to Toronto Building.

It adds a review. Lots within the conservation authority's regulated area need its sign-off before the permit, and the setback from the edge governs where an addition can go. We find that out at the zoning check.

A Scarborough kitchen renovations starts with a site walk.