06 · Burlington, Halton Region

Kitchen renovations in Burlington

A kitchen renovation in the GTA is usually a structural job in disguise: the wall that has to come out carries the floor above, and the sink is moving to where the drain is not. The Burlington brief is usually a custom home on a lakefront lot, a second storey on a bungalow, or a rear addition on a 1980s plan.

Kitchen renovations · Burlington

Burlington, on the ground.

Burlington is postwar houses on deep lakefront lots in Roseland and Shoreacres, 1970s and 1980s subdivisions, and escarpment lots in Aldershot and the rural north. In those houses in Burlington, the kitchen is usually at the back, walled off from the dining room, and the job is to open it up and bring it into the plan. Lakefront and subdivision lots take a crane and a bin, and escarpment lots bring the Escarpment Commission and Conservation Halton into the review. The kitchen comes out behind dust walls, the beam and the services go in, and the cabinets, stone and appliances from the catalogue go in last, with the rest of the house kept clean throughout.

Read more about building in Burlington or the full kitchen renovations page.

What is included

On the drawing.

01

A measured plan and a rendering of the finished kitchen before you sign

02

Engineered drawings for any wall that comes out, and the building permit if one is needed

03

Demolition with dust walls and floor protection to the rest of the house

04

Beam and posts where a wall comes out, plumbing and electrical moved to the new plan

05

Cabinets, counters, backsplash, lighting, flooring and appliances installed from the catalogue

06

A deficiency walk with the list closed before the last payment, and a written warranty

Permits in Burlington

Paper first.

A kitchen renovation needs a building permit where a load-bearing wall comes out or plumbing is relocated, and the electrical is inspected under its own permit. The City of Burlington issues the permit, and lots on the escarpment may also need the Niagara Escarpment Commission's permit first.

  • A building permit is required where a load-bearing wall comes out or plumbing is relocated.
  • Electrical work is inspected under the Electrical Safety Authority's permit, pulled by the licensed electrician.
  • A kitchen rebuilt in the same footprint with the same services usually needs no building permit.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Burlington
DriverWhat we look at
Does the plan changeA kitchen in the same footprint with new finishes, or a kitchen that moves and opens into the next room.
StructureA load-bearing wall coming out is a beam, posts and footings sized by the engineer.
ServicesHow far the sink, the range and the panel circuits move from where they are.
Cabinets and stoneCustom versus semi-custom cabinets, counter material, and the length of the run.
AppliancesPanel-ready, gas versus induction, a hood that needs a new duct through the roof.

No price ranges on this site. The measured plan sets the number, and the catalogue lets you move it line by line.

Kitchen renovations questions from Burlington

If a wall comes out or the plumbing moves, yes, from the City of Burlington. A kitchen rebuilt in place with the same services usually does not. We tell you which at the site walk.

Weeks for a kitchen rebuilt in place, longer when a wall comes out and the plan changes. The schedule is written into the contract with the drawings.

Usually, with reinforcement decided by the engineer from a test pit. The subdivision lots have the room for a crane.

Yes, and many lots there have been. The zoning envelope for the street sets the height and the setbacks, and the lakefront brings the conservation authority in. The zoning check comes first.

A Burlington kitchen renovations starts with a site walk.

Start with a site walkSee the work