01 · Whitchurch-Stouffville, York Region

Custom homes in Whitchurch-Stouffville

A custom home starts with the lot, not the floor plan. The zoning envelope, the services at the street and any conservation or heritage overlay decide how much house the lot can carry, and Savino Construction reads all of it before a line is drawn. Stouffville is subdivisions built since 2000 around a small century core on Main Street, with rural estate lots on the moraine in Whitchurch. That stock is why most custom homes in Stouffville start with a tear-down: the land has outlasted the house on it.

Custom homes · Stouffville

Whitchurch-Stouffville, on the ground.

Town lots are regular and take a crane and a bin, while rural lots bring a well, a septic system and the Moraine plan into the review. The demolition, the excavation, the crane days and the material drops are planned around the neighbours before the first truck arrives, and the schedule is written into the contract.

Read more about building in Whitchurch-Stouffville or the full custom homes page.

What is included

On the drawing.

01

Zoning review of the lot before design starts, so the house you draw is one the city will approve

02

Engineered drawings and a photorealistic rendering of the finished house

03

Building permit application filed and followed by us, with any conservation or heritage review handled first

04

Demolition of the existing house where there is one, with the permit and disconnects it needs

05

Foundation, framing, envelope, roof, mechanical, electrical and finishes by our crew and our trades

06

A deficiency walk with the list closed before the last payment, and a written warranty at handover

Permits in Whitchurch-Stouffville

Paper first.

A custom home needs a building permit with engineered drawings, a separate demolition permit where a house comes down first, and a Committee of Adjustment hearing if the design is outside the zoning envelope. The Town of Whitchurch-Stouffville issues the permit, and rural lots add septic design and the conservation authority's review.

  • A building permit with engineered drawings is required in every GTA municipality.
  • Where an existing house comes down first, a demolition permit and utility disconnects are separate applications.
  • A design outside the zoning envelope goes to the Committee of Adjustment before the permit.
  • Ravine, waterfront, moraine and escarpment lots add a conservation authority or commission review first.
  • New homes sold in Ontario need a licensed builder and Tarion enrolment. [Kam confirms the HCRA licence and Tarion status.]

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Whitchurch-Stouffville
DriverWhat we look at
Floor area and storeysThe square footage above and below grade sets the structure, the envelope and the hours.
The lotA serviced infill lot and a rural lot on a well and septic are different jobs before the house is drawn.
ApprovalsCommittee of Adjustment, conservation authority, heritage or escarpment review each add time before the permit.
Envelope and finishesBrick versus stone, window count and size, roof form, and the interior finish level chosen from the catalogue.
MechanicalHeating and cooling type, in-floor heat, a backup system on a rural lot.

There is no price per square foot on this site. A number given before a site walk and a drawing is a guess, and a guess turns into a change order later.

Custom homes questions from Stouffville

The zoning by-law sets height, setbacks, lot coverage and floor area for the street. We run that check before design so the house you draw is one the Town of Whitchurch-Stouffville will approve.

Yes. The demolition permit, the disconnects and the tear-down are part of the same contract as the new house, so there is one schedule from start to keys.

A well, a septic system and the Moraine plan. Each brings a review before the permit, and the septic capacity can limit how many bedrooms the house has.

Usually. The lots are regular and the rear yard often has room, and the addition ties into a house that is structurally simple. The zoning check confirms the setback and the lot coverage.

A Stouffville custom homes starts with a site walk.

Start with a site walkSee the work