Load-bearing wall removal in Etobicoke

Etobicoke is Kingsway brick two-storeys and postwar bungalows in Alderwood, Humber Valley and Islington, most on lots wide enough to work from the driveway. In those houses in Etobicoke, the wall between the kitchen and the dining room is the one that usually comes out, and it usually carries the floor above. Taking out a load-bearing wall is an engineering job with a demolition inside it: the engineer sizes the beam, the posts and the footings, and the crew shores the floor, cuts the wall and lands the steel.

Load-bearing wall removal · Etobicoke

Etobicoke, on the ground.

The Etobicoke brief is usually a second storey on a bungalow, a rear addition with a new kitchen, or a custom home where the old house has run its course. The floor above is shored on both sides, the wall comes out behind dust walls, the beam is set and landed on new footings, and the finishes are patched so the wall was never there.

Read more about building in Etobicoke or the full load-bearing wall removal page.

What is included

On the drawing.

01

A site walk that identifies which walls carry load and what sits above them

02

Engineered drawings with the beam, posts and footings sized

03

Building permit filed and followed by us

04

Temporary shoring on both sides of the wall, floor protection and dust walls

05

Wall out, beam set, posts landed on new footings, floors levelled

06

Drywall, flooring and finishes patched or replaced so the wall was never there

Permits in Etobicoke

Paper first.

A load-bearing wall needs a building permit with an engineer's drawing, and the inspector sees the beam and posts before they are closed in. Toronto Building issues the permit; lots along the Humber and Mimico Creek add a conservation authority review first.

  • A building permit with engineered drawings is required in every GTA municipality for any wall that carries load.
  • The inspector sees the beam and the posts before they are closed in.
  • Ducts, plumbing and wiring moved out of the wall are permitted and inspected with their own trades.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Etobicoke
DriverWhat we look at
Span and loadA long opening under two floors needs a bigger beam and posts on new footings.
Flush or dropped beamA beam hidden in the ceiling costs more than one below it, and the joists above decide whether it is possible.
FootingsPosts need something to land on, and that can mean new footings through the basement slab.
What is in the wallDucts, plumbing and wiring that have to move before the wall can go.
FinishesMatching an old hardwood floor across the opening, or refinishing the whole room.

No price per wall on this site. The engineer's drawing sets the number.

Load-bearing wall removal questions from Etobicoke

For a load-bearing wall, yes, from the City of Toronto (Toronto Building), with an engineer's drawing. For a partition wall carrying nothing, usually no. We tell you which at the site walk.

Often. A flush beam sits between the joists so the ceiling stays flat. It costs more than a dropped beam, and what is above decides whether it is possible.

If the lot is inside the conservation authority's regulated area, its review comes before the permit and sets the limits on what can be built and where. We check the mapping at the zoning stage.

Usually. The 1950s bungalows in Alderwood, Humber Valley and Islington were built on foundations that often carry a second floor with reinforcement at the corners, and the lots have the width to crane the trusses in. The engineer confirms it from a test pit before drawings.

A Etobicoke load-bearing wall removal starts with a site walk.