Laneway houses in Burlington
A laneway house is a self-contained home at the back of a lot that fronts a public lane, built where the garage stood, and the lot check comes before anything is drawn. Burlington is postwar houses on deep lakefront lots in Roseland and Shoreacres, 1970s and 1980s subdivisions, and escarpment lots in Aldershot and the rural north. In Burlington that means checking the lane, the fire access route and the lot depth against the rules before the design starts.
Burlington, on the ground.
Lakefront and subdivision lots take a crane and a bin, and escarpment lots bring the Escarpment Commission and Conservation Halton into the review. The garage comes down, the services are trenched from the house or the street, and the new house goes up at the back of the lot with deliveries from the lane.
Read more about building in Burlington or the full laneway houses page.
On the drawing.
A lot check against the laneway by-law: lane frontage, fire access route, setbacks, height, lot depth
Engineered drawings and a rendering of the laneway house
Building permit filed and followed by us, with the demolition permit for the garage
Foundation, framing, envelope, roof, mechanical, electrical and finishes
Services from the main house or the street as the drawings call for
A deficiency walk with the list closed before the last payment, and a written warranty
Paper first.
A laneway house needs a building permit with engineered drawings and a demolition permit for the garage, and the fire access route is part of the review. The City of Burlington issues the permit, and lots on the escarpment may also need the Niagara Escarpment Commission's permit first.
- A building permit with engineered drawings is required, plus a demolition permit for the garage.
- In Toronto, laneway suites are permitted as-of-right on qualifying lots under the City's by-law; a lot outside the rules goes to the Committee of Adjustment.
- The fire access route from the street is part of the permit review.
- Other municipalities have their own additional residential unit rules. [Kam confirms which ones Savino has built under.]
The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.
| Driver | What we look at |
|---|---|
| Storeys and floor area | One storey or two, and how much of the allowed footprint is used. |
| Services | Water, sewer, gas and hydro run from the main house or from the street, and the distance sets the trenching. |
| Fire access | The route for a fire hose from the street decides whether sprinklers or other measures are needed. |
| The old garage | Demolition and whether the old slab and footings can go. |
| Finish level | Kitchen, bathroom and flooring chosen from the catalogue. |
No price per square foot on this site. The lot check and the drawings set the number.
It needs lane frontage, a fire access route from the street and the setbacks and lot depth the rules call for. We check the lot before drawings. [Kam confirms the Burlington rules Savino has built under.]
the City of Burlington issues the building permit and the demolition permit for the garage, and the fire access route is part of the review.
Yes, and many lots there have been. The zoning envelope for the street sets the height and the setbacks, and the lakefront brings the conservation authority in. The zoning check comes first.
The City of Burlington. Additions, second storeys and new houses all need a building permit with engineered drawings, and escarpment lots may also need the Escarpment Commission's permit.