Home additions in Georgina
An addition is more house on the same lot, and the job lives or dies at the tie-in: where the new foundation meets the old, where the roofs meet, and where the floors have to line up. Georgina is year-round houses and former cottages in Keswick, Sutton and Pefferlaw, with shoreline lots along Lake Simcoe. On that stock in Georgina, the rear addition with a new kitchen across the back is the most common brief, with two-storey additions where the lot has the depth.
Georgina, on the ground.
Shoreline lots bring setback rules and the conservation authority's review, and unserviced lots bring a well and a septic system. The addition goes up as a shell before the wall into the house is opened, so most families stay through the work, and the machine access to the back yard is planned at the site walk.
Read more about building in Georgina or the full home additions page.
On the drawing.
Zoning check of setbacks and lot coverage before design so the addition fits the lot
Engineered drawings and a rendering of the addition inside and out
Building permit filed and followed by us, with any conservation review handled first
Excavation, new foundation, framing, roof and envelope tied into the existing structure
Openings cut into the old house under shoring, with beams sized by the engineer
Mechanical and electrical extended, finishes from the catalogue, a deficiency walk and a written warranty
Paper first.
An addition needs a building permit with engineered drawings, and the setbacks and lot coverage in the zoning by-law decide whether the design goes straight to permit or to the Committee of Adjustment first. The Town of Georgina issues the permit, and shoreline lots add the conservation authority's review before the application is complete.
- A building permit with engineered drawings is required in every GTA municipality.
- Setbacks and lot coverage come from the zoning by-law; a design outside them goes to the Committee of Adjustment first.
- Lots inside a conservation authority's regulated area need its review before the permit.
- Heritage listing adds a review of anything visible from the street.
The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.
| Driver | What we look at |
|---|---|
| Floor area and storeys | A single-storey rear addition and a two-storey one share a foundation but not much else. |
| The tie-in | How much of the existing rear wall opens up, and whether the roofs meet cleanly or the old roof is reworked. |
| Foundation type | Full basement under the addition, crawl space or slab, and what the soil and the water table allow. |
| Lot constraints | Setbacks, lot coverage, a ravine or conservation edge, and how a machine reaches the back yard. |
| Finish level | Kitchen and bathroom scope inside the addition, chosen from the catalogue. |
No price per square foot on this site. The zoning check and the drawings set the number, and the number holds because of them.
The zoning by-law sets rear and side setbacks and a lot coverage limit. We run the check before design so the addition you draw is one the Town of Georgina will approve.
Usually. The shell goes up first, the wall between the house and the addition opens last, and dust walls seal the route in between.
Yes, and many have been. The shoreline setback, the conservation authority's review and the septic capacity decide the footprint. We map those before you commit to drawings.
The Town of Georgina. Additions, second storeys and new houses all need a building permit with engineered drawings, and shoreline lots need the conservation authority's review first.