Home additions in Caledon
An addition is more house on the same lot, and the job lives or dies at the tie-in: where the new foundation meets the old, where the roofs meet, and where the floors have to line up. The Caledon brief is usually a custom home on acreage, an addition on a farmhouse, or a whole-home renovation of a century house in a village.
Caledon, on the ground.
Caledon is estate lots and century farmhouses around Bolton, Caledon East and Inglewood, with new subdivisions at the south end, many on wells and septic systems. On that stock in Caledon, the rear addition with a new kitchen across the back is the most common brief, with two-storey additions where the lot has the depth. Lots are large and access is easy, but the Escarpment, the Moraine and the Greenbelt each add an approval before the building permit. The addition goes up as a shell before the wall into the house is opened, so most families stay through the work, and the machine access to the back yard is planned at the site walk.
Read more about building in Caledon or the full home additions page.
On the drawing.
Zoning check of setbacks and lot coverage before design so the addition fits the lot
Engineered drawings and a rendering of the addition inside and out
Building permit filed and followed by us, with any conservation review handled first
Excavation, new foundation, framing, roof and envelope tied into the existing structure
Openings cut into the old house under shoring, with beams sized by the engineer
Mechanical and electrical extended, finishes from the catalogue, a deficiency walk and a written warranty
Paper first.
An addition needs a building permit with engineered drawings, and the setbacks and lot coverage in the zoning by-law decide whether the design goes straight to permit or to the Committee of Adjustment first. The Town of Caledon issues the permit, and a rural lot brings septic design, well protection and the conservation authority's review into the schedule.
- A building permit with engineered drawings is required in every GTA municipality.
- Setbacks and lot coverage come from the zoning by-law; a design outside them goes to the Committee of Adjustment first.
- Lots inside a conservation authority's regulated area need its review before the permit.
- Heritage listing adds a review of anything visible from the street.
The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.
| Driver | What we look at |
|---|---|
| Floor area and storeys | A single-storey rear addition and a two-storey one share a foundation but not much else. |
| The tie-in | How much of the existing rear wall opens up, and whether the roofs meet cleanly or the old roof is reworked. |
| Foundation type | Full basement under the addition, crawl space or slab, and what the soil and the water table allow. |
| Lot constraints | Setbacks, lot coverage, a ravine or conservation edge, and how a machine reaches the back yard. |
| Finish level | Kitchen and bathroom scope inside the addition, chosen from the catalogue. |
No price per square foot on this site. The zoning check and the drawings set the number, and the number holds because of them.
The zoning by-law sets rear and side setbacks and a lot coverage limit. We run the check before design so the addition you draw is one the Town of Caledon will approve.
Usually. The shell goes up first, the wall between the house and the addition opens last, and dust walls seal the route in between.
The Town of Caledon. Lots on the Niagara Escarpment may also need the Escarpment Commission's permit, and those inside a conservation authority's area need its review first.
Yes. The tie-in between a new addition and an old stone or brick house is the engineering question, and the septic capacity often decides how many bedrooms the addition can have. Both come up at the site walk.