Home additions in Ajax
An addition is more house on the same lot, and the job lives or dies at the tie-in: where the new foundation meets the old, where the roofs meet, and where the floors have to line up. The Ajax brief is usually a second storey on a 1950s house, a rear addition on a 1980s plan, or a lowered basement for a legal suite.
Ajax, on the ground.
Ajax is wartime and 1950s houses near the lake and the old town, 1970s and 1980s subdivisions through the middle, and newer stock north of Taunton. On that stock in Ajax, the rear addition with a new kitchen across the back is the most common brief, with two-storey additions where the lot has the depth. Lots take a crane and a bin, and Duffins Creek and the waterfront put some lots inside a conservation authority's regulated area. The addition goes up as a shell before the wall into the house is opened, so most families stay through the work, and the machine access to the back yard is planned at the site walk.
Read more about building in Ajax or the full home additions page.
On the drawing.
Zoning check of setbacks and lot coverage before design so the addition fits the lot
Engineered drawings and a rendering of the addition inside and out
Building permit filed and followed by us, with any conservation review handled first
Excavation, new foundation, framing, roof and envelope tied into the existing structure
Openings cut into the old house under shoring, with beams sized by the engineer
Mechanical and electrical extended, finishes from the catalogue, a deficiency walk and a written warranty
Paper first.
An addition needs a building permit with engineered drawings, and the setbacks and lot coverage in the zoning by-law decide whether the design goes straight to permit or to the Committee of Adjustment first. The Town of Ajax issues the permit, and lots near Duffins Creek add a conservation authority review.
- A building permit with engineered drawings is required in every GTA municipality.
- Setbacks and lot coverage come from the zoning by-law; a design outside them goes to the Committee of Adjustment first.
- Lots inside a conservation authority's regulated area need its review before the permit.
- Heritage listing adds a review of anything visible from the street.
The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.
| Driver | What we look at |
|---|---|
| Floor area and storeys | A single-storey rear addition and a two-storey one share a foundation but not much else. |
| The tie-in | How much of the existing rear wall opens up, and whether the roofs meet cleanly or the old roof is reworked. |
| Foundation type | Full basement under the addition, crawl space or slab, and what the soil and the water table allow. |
| Lot constraints | Setbacks, lot coverage, a ravine or conservation edge, and how a machine reaches the back yard. |
| Finish level | Kitchen and bathroom scope inside the addition, chosen from the catalogue. |
No price per square foot on this site. The zoning check and the drawings set the number, and the number holds because of them.
The zoning by-law sets rear and side setbacks and a lot coverage limit. We run the check before design so the addition you draw is one the Town of Ajax will approve.
Usually. The shell goes up first, the wall between the house and the addition opens last, and dust walls seal the route in between.
The Town of Ajax. Additions, second storeys, new houses and second units all need a building permit with engineered drawings.
Usually, once ceiling height and egress meet code. Underpinning fixes the height in older houses. We measure at the site walk.