01 · Halton Hills, Halton Region

Custom homes in Halton Hills

A custom home starts with the lot, not the floor plan. The zoning envelope, the services at the street and any conservation or heritage overlay decide how much house the lot can carry, and Savino Construction reads all of it before a line is drawn. Halton Hills is century houses and 1960s bungalows on deep lots in Georgetown and Acton, subdivisions from the 1980s onward, and rural lots on wells and septic systems. That stock is why most custom homes in Halton Hills start with a tear-down: the land has outlasted the house on it.

Custom homes · Halton Hills

Halton Hills, on the ground.

Older lots are deep and rural lots are large, and the escarpment and the Credit River bring the Escarpment Commission and Credit Valley Conservation into the review. The demolition, the excavation, the crane days and the material drops are planned around the neighbours before the first truck arrives, and the schedule is written into the contract.

Read more about building in Halton Hills or the full custom homes page.

What is included

On the drawing.

01

Zoning review of the lot before design starts, so the house you draw is one the city will approve

02

Engineered drawings and a photorealistic rendering of the finished house

03

Building permit application filed and followed by us, with any conservation or heritage review handled first

04

Demolition of the existing house where there is one, with the permit and disconnects it needs

05

Foundation, framing, envelope, roof, mechanical, electrical and finishes by our crew and our trades

06

A deficiency walk with the list closed before the last payment, and a written warranty at handover

Permits in Halton Hills

Paper first.

A custom home needs a building permit with engineered drawings, a separate demolition permit where a house comes down first, and a Committee of Adjustment hearing if the design is outside the zoning envelope. The Town of Halton Hills issues the permit, and unserviced lots add well and septic design to the schedule.

  • A building permit with engineered drawings is required in every GTA municipality.
  • Where an existing house comes down first, a demolition permit and utility disconnects are separate applications.
  • A design outside the zoning envelope goes to the Committee of Adjustment before the permit.
  • Ravine, waterfront, moraine and escarpment lots add a conservation authority or commission review first.
  • New homes sold in Ontario need a licensed builder and Tarion enrolment. [Kam confirms the HCRA licence and Tarion status.]

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Halton Hills
DriverWhat we look at
Floor area and storeysThe square footage above and below grade sets the structure, the envelope and the hours.
The lotA serviced infill lot and a rural lot on a well and septic are different jobs before the house is drawn.
ApprovalsCommittee of Adjustment, conservation authority, heritage or escarpment review each add time before the permit.
Envelope and finishesBrick versus stone, window count and size, roof form, and the interior finish level chosen from the catalogue.
MechanicalHeating and cooling type, in-floor heat, a backup system on a rural lot.

There is no price per square foot on this site. A number given before a site walk and a drawing is a guess, and a guess turns into a change order later.

Custom homes questions from Halton Hills

The zoning by-law sets height, setbacks, lot coverage and floor area for the street. We run that check before design so the house you draw is one the Town of Halton Hills will approve.

Yes. The demolition permit, the disconnects and the tear-down are part of the same contract as the new house, so there is one schedule from start to keys.

Yes. Outside the serviced areas the lot needs a well and a septic design, and lots on the escarpment or near the Credit need the Escarpment Commission's permit or the conservation authority's review. We map those before drawings.

The Town of Halton Hills, for Georgetown and Acton both. Additions, second storeys and new houses all need a building permit with engineered drawings.