Basement underpinning in Toronto

Toronto's stock runs from 1890s brick semis downtown to 1950s bungalows at the edges, on lots that are rarely wider than 30 feet. Those basements in Toronto were never meant to be lived under, and lowering the floor is what turns them into a suite or a real family room. Underpinning lowers a basement floor by extending the foundation walls down in short engineered sections, one at a time, so the house is never sitting on an unsupported wall. The result is legal ceiling height for a suite or a family room.

Basement underpinning · Toronto

Toronto, on the ground.

In Toronto the usual brief is a second storey on a semi, a rear addition with a new kitchen, or a laneway suite behind a house that already has one. The work is in the basement and the house stays supported throughout, so most families stay; each section is dug, formed, poured and inspected before the next.

Read more about building in Toronto or the full basement underpinning page.

What is included

On the drawing.

01

A site walk with measurements of the existing ceiling height and a look at the footings

02

Engineered drawings with the underpinning sequence and the new footing depth

03

Building permit filed and followed by us

04

Excavation and pours in numbered sections, each inspected before the next

05

New slab, drainage, sump and waterproofing where the drawings call for them

06

A deficiency walk, and a written warranty

Permits in Toronto

Paper first.

Underpinning needs a building permit with engineered drawings, and each section is inspected before the next one is dug; a suite that follows needs its own permit. Toronto Building issues the permit, and any design outside the zoning envelope goes to the Committee of Adjustment first, so the zoning check comes before the drawings are final.

  • A building permit with engineered drawings is required in every GTA municipality.
  • Each underpinning section is inspected before the next one is dug.
  • On a semi, the drawings address the shared wall and the neighbour's foundation.
  • A suite that follows needs its own permit for the plumbing, the egress and the fire separation.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Toronto
DriverWhat we look at
How far the floor dropsEvery extra inch of depth is more excavation and a deeper footing.
Perimeter lengthThe number of underpinning sections is set by the wall length, and each one is dug, formed and poured on its own.
Soil and waterClay, sand and a high water table each change the sequence and the drainage.
Benching insteadWhere the soil or the neighbour's foundation rules out underpinning, benching lowers the floor with a ledge along the wall.
What followsA lowered basement is usually the start of a suite, and the plumbing and finishes come after the slab.

No price per linear foot on this site. The site walk and the engineer's drawings set the number.

Basement underpinning questions from Toronto

Usually. The site walk measures the ceiling height and checks the footings, and the engineer draws the sequence. the City of Toronto (Toronto Building) issues the permit and inspects each section.

Usually, yes. The house is supported throughout and the work stays in the basement. Noise and dust are real, and the basement is out of use for the duration.

Often, yes. The shared wall is the engineering question: the new floor loads onto a party wall the neighbour also owns, so the drawings have to show how the load is carried without touching their side. We check the by-law height limit for the street before you commit to drawings.

It needs to sit on a public laneway, with a route for a fire hose from the street and enough lot depth for the setbacks. Garden suites cover lots without a lane. We check the lot against the by-law before you spend anything on drawings.

A Toronto basement underpinning starts with a site walk.

Start with a site walkSee the work