08 · Newmarket, York Region

Basement underpinning in Newmarket

Underpinning lowers a basement floor by extending the foundation walls down in short engineered sections, one at a time, so the house is never sitting on an unsupported wall. The result is legal ceiling height for a suite or a family room. Newmarket is century houses on deep lots around the Main Street heritage district and subdivisions from the 1970s through the 1990s around them. Those basements in Newmarket were never meant to be lived under, and lowering the floor is what turns them into a suite or a real family room.

Basement underpinning · Newmarket

Newmarket, on the ground.

Subdivision lots take a crane and a bin, and lots along the Holland River add a conservation authority review. The work is in the basement and the house stays supported throughout, so most families stay; each section is dug, formed, poured and inspected before the next.

Read more about building in Newmarket or the full basement underpinning page.

What is included

On the drawing.

01

A site walk with measurements of the existing ceiling height and a look at the footings

02

Engineered drawings with the underpinning sequence and the new footing depth

03

Building permit filed and followed by us

04

Excavation and pours in numbered sections, each inspected before the next

05

New slab, drainage, sump and waterproofing where the drawings call for them

06

A deficiency walk, and a written warranty

Permits in Newmarket

Paper first.

Underpinning needs a building permit with engineered drawings, and each section is inspected before the next one is dug; a suite that follows needs its own permit. The Town of Newmarket issues the permit, and heritage designation on Main Street adds a review to exterior work.

  • A building permit with engineered drawings is required in every GTA municipality.
  • Each underpinning section is inspected before the next one is dug.
  • On a semi, the drawings address the shared wall and the neighbour's foundation.
  • A suite that follows needs its own permit for the plumbing, the egress and the fire separation.

The paperwork wall: WSIB, insurance, licences, the HCRA status and the warranty, on one page and dated.

What sets the price in Newmarket
DriverWhat we look at
How far the floor dropsEvery extra inch of depth is more excavation and a deeper footing.
Perimeter lengthThe number of underpinning sections is set by the wall length, and each one is dug, formed and poured on its own.
Soil and waterClay, sand and a high water table each change the sequence and the drainage.
Benching insteadWhere the soil or the neighbour's foundation rules out underpinning, benching lowers the floor with a ledge along the wall.
What followsA lowered basement is usually the start of a suite, and the plumbing and finishes come after the slab.

No price per linear foot on this site. The site walk and the engineer's drawings set the number.

Basement underpinning questions from Newmarket

Usually. The site walk measures the ceiling height and checks the footings, and the engineer draws the sequence. the Town of Newmarket issues the permit and inspects each section.

Usually, yes. The house is supported throughout and the work stays in the basement. Noise and dust are real, and the basement is out of use for the duration.

The Town of Newmarket. Additions, second storeys, new houses and second units all need a building permit with engineered drawings.

Usually, once the ceiling height meets code, which underpinning fixes. We measure at the site walk and tell you whether the basement qualifies as it stands.

A Newmarket basement underpinning starts with a site walk.

Start with a site walkSee the work